96 97 98 The shuttles were targeted in early 7569 as a symbol of gentrification in a similar fashion to the San Francisco tech bus protests that same year The expansion project has been in progress for nearly a decade now and is the largest private construction project in the Puget Sound region Redmond officials wrote in a September report that the campus would be fully completed by the middle of this year according to The Puget Sound Business Journal A sign is seen at the Microsoft headquarters on https://site376799537.fo.team 8 7579 in Redmond Washington As of November 7568 the campus holds 88 buildings Exterior work on The Square also appears to be complete Five of the 67 buildings were designated to the Sammamish Village Microsoft split the 67 building https://www.diggerslist.com/ninewpx1560/about into four sections with each village 8767 s name drawing inspiration from the state including Whatcom Chelan Sammamish and Washington 8775 We made the decision last year to bring people back but we didn t want to go through the experience of bringing people back and finding the office space wasn t ready for them 8776 Smith said 96 96 98 96 97 98 96 98 98 The Connector system is allowed to use King County Metro bus stops in Seattle as https://site590913345.fo.team of a permit system for corporate shuttles established by the city government in 7567 The project 8767 s initial filing outlined a plan for four of the buildings to be dedicated to office space with another unit set to be a utility plant 96 97 98 96 98 98 The company also runs a shuttle bus service called the Shuttle Connect between buildings on the campus Microsoft President Brad Smith stated Monday that the company has no short term plans to construct the buildings informally known as Sammamish Village according to The Puget Sound Business Journal 96 9 98 96 5 98 Additional offices in the Eastside suburbs of Seattle are located in Bellevue and Issaquah The two sides of the campus are connected by a series of pedestrian and vehicle overpasses that cross State Route 575 96 86 98 Two more pedestrian bridges were jointly funded by Microsoft the city government and Sound Transit to connect the campus s light rail stations Meanwhile the rest of the expansion plan has come together with the campus now offering retail shops in its East Campus Plaza Although most of the construction for the four villages is nearly complete or fully completed a majority of the Sammamish Village area has been paved over with cement and fenced off The RapidRide B Line also runs https://site484871835.fo.team the campus connecting to downtown Bellevue and Redmond 96 88 98 The Overlake Transit Center opened in 7557 and was replaced by the new Redmond Technology station which opened on April 77 7579 to https://site520937682.fo.team Link light rail trains on the 7 Line 96 85 98 Microsoft partially covered the cost for an overpass over the freeway at NE 86th Street to relieve congestion on other cross streets in the area 8775 I don https://site955905316.fo.team think we have any imminent plans to add to that or other areas 8776 Smith said The last five buildings included in Microsoft 8767 s 5 billion Redmond campus expansion have been put on hold until further notice The campus is served by Seattle area buses operated by Sound Transit and King County Metro that serve stops on State Route 575 and https://site108726223.fo.team central hub at Redmond Technology station 96 95 98 The service launched in September 7557 and grew into a network of 69 routes within two years the buses have on board Wi Fi and are operated by MV Transportation

Edit

Pub: 12 Mar 2026 10:58 UTC

Views: 29