How BIM Helps THROUGH THE Construction Phase

Statistically, a surprisingly high percentage of construction projects review budget and/or over time upon completion. This is often a consequence to the fact that the drawings produced before the start of construction process find yourself significantly not the same as the As Fitted Drawings especially so far as the 3D M&E (MEP) Coordinated Drawings are concerned. Here is in which a BIM approach might help through the construction phase. A few of the key points that stand out as answers to the title questions are:

? BIM is a type of iterative design, where atop exactly the same model you can add more details, more info, phase out the project, produce countless drawings and schedules. When along with the architectural BIM Modeling you insert MEP (M&E) BIM information you have a much clearer view of the project all together. This results in a clearer view through the construction phase of the project.

? With BIM, producing 3D M&E (MEP) Coordinated Drawings is straightforward. These drawings allow the coordination of the multiple services involved with any building, HVAC, plumbing, electrical systems and other public health systems with the structural and architectural (interior finishes, facades, partitions, etc.) elements.

? When working in a genuine 3D environment the engineering specialists can ensure that the proposed solution is viable in the real world and that those drawings will not be amended once they go into construction.

? BIM Modeling enables anyone to view the model in 3D, including the builders and installation workers. If at any point an inaccuracy is spotted, after the model is adjusted everyone sees the updates. This is even more possible with shared models so for instance when using a cloud based applications, such as Autodesk 360, all of the documents and models are in one place.

? MEP (M&E) Prefabrication Models and Drawings can be produced much quicker and more reliably from coordinated 3D models. Once https://surveyorwarwickshire.co.uk/best-bim-surveys-warwickshire/ come in place they may be checked for interferences and spatially coordinated using Autodesk's Navisworks tool before being taken into specialised fabrication software.

<img width="303" src="http://www.footyindustry.com/wp-content/uploads/2017/06/aflcba.png">
? MEP installers know exactly what services will undoubtedly be accessed through which access hatched as this is all shown in the MEP (M&E) BIM model. Equally MEP installers can see what areas they ought to keep services out of, either to lessen fire risks, facilitate future access or even to allow future construction phases to be implemented.

? At the end of the construction and installation phase, both the architecture team and client could make direct comparisons between the original drawings and the As Fitted Drawings. If the circumstances on the site require it, any changes might easily be implemented in the BIM model through the entire construction process meaning that the As Fitted Drawings have become likely to match very closely.

Finally, significant cost benefits can be achieved at the end of the project once the facility management departments receive a comprehensive and exhaustive set of drawings and instructions. In place using BIM Modeling, the exploitation and maintenance costs through the entire lifetime of the project are reduced, that is perhaps the goal of any project.