Oasis Residences payment plan and details Guide

Oasis Residences payment plan and details Guide

The listed Oasis Residences payment plan is structured as 60/40, with a starting price of AED 705,000 for a studio. The project page specifies 20% upfront, followed by 40% during construction, while the remaining 40% should be confirmed in the sale agreement before reservation. Handover is scheduled for Q2 2027.

Oasis Residences is an off-plan development by HZ Development in Dubai South. The project includes 159 studios and one- to three-bedroom apartments, with advertised areas from 427 sq. ft. to 1,992 sq. ft.

How the 60/40 payment plan works

For a studio priced from AED 705,000, the 20% initial payment equals AED 141,000. The 40% construction-stage share equals AED 282,000, leaving AED 282,000 under the stated 60/40 structure.

The available material identifies the first two payment stages but does not specify the exact dates or instalment schedule for each construction payment. It also does not state whether the final 40% falls due at handover, on a fixed date, or under another contractual condition. Buyers should request the full payment schedule and match every instalment against the sale and purchase agreement.

  • At reservation, check whether the 20% payment includes any separate booking amount or administrative charge.
  • During construction, request the dates attached to the 40% construction share and the conditions for each instalment.
  • Before signing, confirm when the remaining 40% becomes payable and what happens if handover moves beyond Q2 2027.

The starting price applies to the advertised studio. One-bedroom apartments start from 582 sq. ft., two-bedroom apartments from 1,038 sq. ft., and three-bedroom apartments from 1,992 sq. ft.; prices for these layouts are listed as available on request.

Verification before making a reservation

For an off-plan property, supplier verification translates into checking the developer, project documents, unit availability, and payment terms. HZ Development is named as the developer, but the buyer should still verify the seller’s authority, the project registration details, and the identity of the party receiving funds.

Ask for a current unit quotation showing the apartment number, floor, area, price, payment stages, and any included charges. The quotation should match the floor plan and the official contract. If the sales representative gives a different price from AED 705,000, request a written explanation for the difference.

The project listing describes studios and one- to three-bedroom apartments with modern finishes, integrated kitchen appliances, floor-to-ceiling windows, and ceramic bathroom tiles. These descriptions should be compared with the technical specification attached to the contract because marketing descriptions do not replace contractual obligations.

The Oasis Residences payment plan and details page can serve as a reference point, but buyers should obtain the current reservation form, contract, floor plan, and payment schedule before transferring funds.

Inspection and handover checks

A warehouse inspection does not apply to a residential purchase. The relevant inspection is a review of the construction site, approved plans, show materials, and finished apartment before handover.

During the pre-handover inspection, compare the delivered unit with the agreed floor plan and specifications. Check the stated living area, window operation, flooring, cabinetry, bathroom finishes, appliances, doors, paintwork, lighting points, and visible water or electrical defects.

Packaging reinforcement is also not relevant to this transaction because the buyer is acquiring a fixed property rather than shipped goods. The practical equivalent is protection of the buyer’s contractual position: keep the approved plan, finish schedule, payment receipts, correspondence, and signed variation documents together.

When the payment plan may become unsuitable

The 60/40 structure may suit a buyer who can fund the construction instalments and reserve the final 40% for the contractual due date. It becomes less suitable when the buyer expects to rely on uncertain rental income or future financing to cover the last payment.

The project advertises an average ROI of 6-7% and a maximum ROI of 8-9%, but these figures are projections rather than guaranteed returns. Rental demand, operating costs, vacancy, furnishing, and the final purchase price will affect the actual result.

Dubai South offers access to Expo City Dubai and the airport, while the wider district includes schools, parks, sports facilities, supermarkets, and transport connections. Those factors may support future demand, but they do not remove construction, financing, or handover risks.

Acceptance checklist before signing

  • Confirm the developer and authorised seller.
  • Match the unit number, area, floor plan, and price.
  • Verify the 20% upfront amount in writing.
  • Obtain dates for the 40% construction payments.
  • Confirm the timing and conditions for the remaining 40%.
  • Check the Q2 2027 handover wording in the contract.
  • Keep the technical specification with the signed documents.
  • Schedule a snagging inspection before accepting the apartment.
Edit

Pub: 22 Nov 2026 19:42 UTC

Views: 1