Main stages of repair in the apartment

Main phases of repair in the apartment.

How to begin repair of the apartment?

The very first phase of the repair work of old apartments is the destruction and taking apart first of all of the worn out walls and partition walls, getting rid of the wall and ceiling finishing. This stage is one of the most "dirty" stages of the repair work.

One more amongst the most crucial and "dirty" works is the window block replacement. It is needed to do this firstly since dirt and dust will be unallowable throughout following stages and it is prohibited at all to open windows throughout painting and wallpaper works (big drops of the temperature and moisture are unallowable). After installing windows and windowsills it is required to pack them instantly in polyethylene film and to cover windowsills in addition by the fiberboard (in order to prevent scratches).

The following stage is electrical wiring. Circuitry can be installed in walls or along the floor. Wiring is made inside the pipelines to guarantee electrical safety and increase reliability. The pipe safeguards circuitry from external damages and permits to replace the wire totally without breaking walls and flooring just by inserting the new wire rather of the old one.

House Painting follows the circuitry. The regular mistake throughout the synchronised conducting of such works takes place when employees forget to lay out one of the cables and home painters have currently plastered and ravelled the wall. As a result, additional works are required to seal chases on the ended up wall. The places of the feed switch and wall outlet place and their number must be thought-out beforehand. The scheme of power electrical wiring is generally consisted of into the style project.

Later on the system need to be ready to service in case of failures. In addition to the circuitries, the telephone cable television and the television cable television are set out. The power cable ought to not be laid out near the telephone and antenna cables to prevent sound pickup and disturbance. The most strange minute is setting out the TV cable television. In order to make two (or three) TV sets in the home the 2nd cable television is often merely "securely soldered" in parallel, so the cable resistance is lowered. As a result, the display quality is degraded, many programs can't be received and etc. In order to prevent such scenario it is essential to invite a professional with unique devices. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-lasting procedure, that is why it is conducted simultaneously in all premises, if it is possible. Hold-ups are related to the innovation. Each applied layer of the plaster (or completing ending up) need to dry totally before the work will continue.

Works in sanitary arrangements and the cooking area start all at once with house painting. It is much better to meet so-called "dirty" operate in the first place and concurrently. In accordance with the strategy of the hygienic professional place welding, wall chasing and pipeline run are carried out. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.

Then works in sanitary plans are carried out according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below stage is putting together ceiling and laying tiles on the floor. And at last other sanitary devices, mixers and accessories are mounted.

After circuitry, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not set up during this stage in order to save their surface appearance. The finish puttying of walls is conducted concurrently. The highly exact control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines wetness of the material.

The following phase is the process of fill. Fill can be made with different materials-- from typical masonry cement-sand mix to self-aligning floorings. The advantage of the simple mix is its cheapness, the disadvantage is that such mixture is much harder aligned at the level and the last dry time of such fill is 40 days, just then the next stage of the deal with flooring can be carried out, i.e. the period is too long. Self-leveling self-aligning floorings are much more expensive, but more technological. Aligning happens nearly "automatically" i.e. fluid option of mixture is poured out, then it runs and you get the horizontal surface area. The last dry time is 15 days i.e. you have substantial time economy. The system "warm floor" is installed into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry lining up (the fill innovation) is used bases for floors with adjustable flooring battens are mounted.

After fill door boxes and door are installed. Installation of doors should take into the account thickness of future floor covering. After installation the door can be removed its hinges and eliminated up until the end of repair work or loaded into polyethylene movie to protect https://uws-ce.instructure.com/eportfolios/14997/Home/how-plumbers-detect-water-leaks from damages. All at once ceiling can be painted and the tile can be laid in that premises where it was planned. The tile must be laid on the absolutely dry overlay.

Finishing of the floor installing depends upon the planned covering. In most cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to provide the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.

In properties where finish covering of the flooring is laminated flooring or parquet stockpile, the common wallpapers are pasted (not for painting) in the first place. Then the floor covering is mounted.

If finish covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed repercussion is connected just with such scrambling procedure when the excellent quantity of dust is produced. In spite of the reality that good flooring mills are geared up with the vacuum, the enough amount of dust is precipitated on surrounding subjects consisting of walls. Dust is really acerbic and is terribly washed off. That is why in order not to harm wallpapers, they are pasted after scrambling and in order the parquet do not take in the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be considered to be finished. It is left only to set up the plinths, ornamental elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is required to note that the series of works was noted in basic and can change depending on the definite circumstance-- the variety of rooms in premise, your resources, peculiarities of the building of the multilevel premises. It is based on good sense and every person efficient in analysis can separately develop such a sequence.