Main phases of repair works in the apartment
Main stages of repair works in the apartment.
How to begin repair of the apartment?
The first phase of the repair work of old houses is the damage and dismantling to start with of the dilapidated walls and partition walls, removing the wall and ceiling coating. This phase is among the most "filthy" phases of the repair work.
One more among the most crucial and "dusty" works is the window block replacement. It is necessary to do this to start with because dirt and dust will be unallowable during following stages and it is forbidden at all to open windows during painting and wallpaper works (large drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is necessary to pack them right away in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following phase is wiring. Electrical wiring can be installed in walls or along the floor. Circuitry is made inside the pipes to guarantee electrical security and increase dependability. The pipeline safeguards electrical wiring from external damages and enables to change the wire completely without breaking walls and flooring just by inserting the brand-new wire instead of the old one.
House Painting follows the electrical wiring. The regular mistake throughout the simultaneous conducting of such works takes place when employees forget to lay out among the cable televisions and house painters have currently plastered and smoothed out the wall. As a result, extra works are required to seal chases on the completed wall. The places of the feed switch and wall outlet location and their number should be thought-out ahead of time. The scheme of power electrical wiring is typically included into the style project.
Later on the system should be prepared to service in case of failures. In addition to the circuitries, the telephone cable and the television cable television are set out. The power cable should not be laid out near the telephone and antenna cable televisions to avoid sound pickup and interference. The most peculiar minute is laying out the television cable television. In order to make two (or 3) television set in the house the 2nd cable is often simply "firmly soldered" in parallel, so the cable television resistance is lowered. As a result, the display screen quality is weakened, many programs can't be received and etc. In order to prevent such circumstance it is essential to invite a professional with special equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is carried out all at once in all premises, if it is possible. Delays are linked with the technology. Each used layer of the plaster (or completing ending up) need to dry entirely before the work will continue.
Works in hygienic plans and the kitchen start all at once with house painting. It is much better to meet so-called "dirty" operate in the first place and at the same time. In accordance with the strategy of the hygienic professional place welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, but radiators are not installed.
Then operates in hygienic arrangements are performed according to the strategy. The bath is installed, then walls are smoothed out and the tile is laid on walls. The list below phase is assembling ceiling and laying tiles on the flooring. And at last other sanitary devices, mixers and accessories are mounted.
After circuitry, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of electrical wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up during this phase in order to save their surface appearance. The finish puttying of walls is conducted all at once. The technically specific control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that measures wetness of the material.
The following stage is the process of fill. Fill can be made with various materials-- from usual masonry cement-sand mixture to self-aligning floors. The benefit of the simple mixture is its cheapness, the disadvantage is that such mixture is much harder aligned at the level and the final dry time of such fill is 40 days, just then the next phase of the work with floor can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are much more expensive, but more technological. Aligning takes place nearly "immediately" i.e. fluid solution of mixture is poured out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is set up into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry lining up (the fill technology) is used bases for floorings with adjustable flooring battens are mounted.
After fill door boxes and door are installed. Installation of doors need to take into the account density of future floor covering. After installation the door can be removed its hinges and eliminated till the end of repair work or packed into polyethylene film to safeguard from damages. All at once ceiling can be painted and the tile can be laid in that premises where it was planned. The tile must be laid on the definitely dry overlay.
Finishing of the flooring mounting depends upon the planned covering. In most cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to supply the close fixing of plywood and long-term service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.
In properties where surface covering of the flooring is laminated flooring or parquet hoard, the common wallpapers are pasted (not for painting) in the first location. Then the floor covering is mounted.
If surface covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The discussed repercussion is linked just with such rushing process Click here for more info when the terrific amount of dust is developed. In spite of the truth that good flooring mills are geared up with the vacuum cleaner, the enough amount of dust is sped up on surrounding subjects consisting of walls. Dust is extremely acerbic and is badly washed off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be considered to be ended up. It is left just to install the plinths, decorative components, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is essential to note that the sequence of works was noted in general and can alter depending upon the certain situation-- the variety of spaces in premise, your resources, peculiarities of the building and construction of the multilevel properties. It is based upon common sense and everyone efficient in analysis can independently develop such a series.