Statistically, a surprisingly high percentage of construction projects go over budget and/or over time upon completion. This is usually a consequence to the fact that the drawings produced before the start of construction process find yourself significantly not the same as the As Fitted Drawings especially as far as the 3D M&E (MEP) Coordinated Drawings are worried. Here is in which a BIM approach can help through the construction phase. A few of the key points that stick out as answers to the title questions are:

? BIM is a type of iterative design, where atop the same model you can add more details, more information, phase out the project, produce countless drawings and schedules. When along with the architectural BIM Modeling you insert MEP (M&E) BIM information you've got a much clearer view of the project as a whole. This results in a clearer view through the construction phase of the project.

? With BIM, producing 3D M&E (MEP) Coordinated Drawings is straightforward. These drawings permit the coordination of the multiple services involved with any building, HVAC, plumbing, electrical systems and other public health systems with the structural and architectural (interior finishes, facades, partitions, etc.) elements.

? When working in a true 3D environment the engineering specialists can ensure that the proposed solution is viable in real life and that those drawings won't be amended once they go into construction.

<img width="351" src="https://www.ridgewaysurveys.com/assets/images/bim-revit-2.jpg">
? BIM Modeling enables anyone to view the model in 3D, like the builders and installation workers. If at any point an inaccuracy is spotted, once the model is adjusted everyone sees the updates. That is a lot more possible with shared models so for example when working with a cloud based applications, such as Autodesk 360, all of the documents and models are in one place.

? MEP (M&E) Prefabrication Models and Drawings could be produced much quicker and much more reliably from coordinated 3D models. Once the models are in place they may be checked for interferences and spatially coordinated using Autodesk's Navisworks tool before being taken into specialised fabrication software.

? MEP installers know exactly what services will be accessed by which access hatched as that is all shown in the MEP (M&E) BIM model. Equally MEP installers can easily see what areas they ought to keep services out of, either to lessen fire risks, facilitate future access or even to allow future construction phases to be implemented.

? By https://surveyorwestmidlands.co.uk/best-bim-surveys-west-midlands/ of the construction and installation phase, both the architecture team and client can make direct comparisons between your original drawings and the As Fitted Drawings. If the circumstances on the site require it, any changes will certainly be implemented in the BIM model throughout the construction process and therefore the As Fitted Drawings have become likely to match very closely.

Finally, significant cost savings can be achieved at the end of the project when the facility management departments receive a comprehensive and exhaustive set of drawings and instructions. In effect using BIM Modeling, the exploitation and maintenance costs throughout the lifetime of the project are reduced, that is possibly the goal of any project.